The first course of block is laid on top of a __________ placed on top of the footing.

Prepare for the Glencoe Carpentry Exam. Practice with flashcards and multiple-choice questions, each offering hints and explanations. Equip yourself for success on your test day!

Multiple Choice

The first course of block is laid on top of a __________ placed on top of the footing.

Explanation:
In laying the first course of block, you need a bed of mortar on top of the footing. This mortar bed provides a level, bonded surface that the blocks can sit on squarely and bond to, distributing the load into the footing and filling small irregularities in the footing so the wall starts true. A loose gravel base wouldn’t stay in place or bond blocks to the footing, a sand bed isn’t stable enough to carry masonry loads, and a concrete slab isn’t a thin bedding for the first course. So the bed of mortar is the correct foundation for the first course.

In laying the first course of block, you need a bed of mortar on top of the footing. This mortar bed provides a level, bonded surface that the blocks can sit on squarely and bond to, distributing the load into the footing and filling small irregularities in the footing so the wall starts true. A loose gravel base wouldn’t stay in place or bond blocks to the footing, a sand bed isn’t stable enough to carry masonry loads, and a concrete slab isn’t a thin bedding for the first course. So the bed of mortar is the correct foundation for the first course.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy